100MW – Tirunelveli, TamilnaduProject Management Consultant

ACE Renewtech had the privilege of providing Project Management Consulting (PMC) for NLC’s Solar Power Project as a part of the 709 MW project announced by the Prime Minister of India. The project is located at Maranthai of Tirunelveli District, Tamil Nadu, India. As a PMC, our scope of work covers Pre-bid engineering activities, strategic advisory and construction management.

  • Project Size : 100 MW
  • Project Type : Utility Scale
  • Location : Tirunelveli, Tamil Nadu
  • Developer : NLC India Limited
  • EPC Contractor : LNV Technology Limited
  • Area Covered : 370 acres
  • Project Completion : 2019 Apr
  • Raved the Solar PMC with 100 MW Debut
  • Acquired 370 Acres of Land in a single stroke
  • Backbone of LNVT’s Pre – Bid Engineering Preparation & Cost Optimization
  • Succeeded in making LNVT as L1 Bidder in their Debut Solar Contract
  • Construction is done with the perseverance of 15+ Engineers
  • Even though it’s an NLC Standard, We Flourished in Quality Engineering
  • 24 x 7 Coordinated with NLC & carried out Inspection