4 MW – Vizag, Andhra PradeshOwner’s Engineer

ACE Renewtech is engaged as Owner’s engineer for 4 MW Captive Solar Power Project at Visakhapatnam, Andhra Pradesh. Responsibilities included review of design and engineering in electrical, civil and structural, Inspection of equipment, Construction monitoring and support, quality assurance and operation and maintenance.

  • Project Size : 4 MW
  • Project Type : Captive Consumption
  • Location : Visakhapatnam, Andhra Pradesh
  • End Client : My Home Industries Private Limited
  • Area Covered : 16 acres
  • Project Completion : 2018 Dec
  • First of its kind in India designed with 1500V (DC) & 800V (AC)
  • Employed 90 kW String Inverters to reduce losses & increase Efficiency Time & Cost Optimization
  • Pre – Bid Engineering activities
  • Achieved Peak Efficiency up to 4.1 MW with 4.6 MW(DC)
  • Reduced Cable Losses with technical perception